CONTAMINATED SITES

Environmental site characterization experts. Phase I & II assessment.

Engineering studies and materials quality control.

We carry out a multitude of tests on granular materials.

Building inspection and technical assessment, evaluation, and monitoring.

Environmental site characterization experts. Phase I & II assessment.

Engineering studies and materials quality control.

We carry out a multitude of tests on granular materials.

Building inspection and technical assessment, evaluation, and monitoring.

Oil Tank Removal | Petroleum distribution Tank

Understanding our process when it comes to gas and oil tank removal and the remediation of contaminated sites.

Initially, a thorough site assessment is conducted to determine the extent of contamination and potential risks.

Then, the tank is emptied, cleaned, and inspected to assess its condition and identify any leaks or damage. Next, proper safety measures are implemented, including containment to prevent further spread of contaminants.

Depending on the situation, specialized equipment such as vacuum trucks or pumps may be used to remove the remaining contents and clean the tank interior. After removal, the tank is properly disposed of according to environmental regulations, and any contaminated soil or groundwater is remediated.

Throughout the process, environmental monitoring is crucial to track progress and ensure that contaminants are effectively removed. Additionally, proper documentation and reporting are essential to meet regulatory requirements and demonstrate compliance with environmental standards. Effective communication with stakeholders, including regulatory agencies and local communities, is also important to address concerns and ensure transparency throughout the process.

Oil Tank Removal | Petroleum distribution Tank

A wholly-owned subsidiary of Groupe SCP Environnement Inc., Services et Expertises Pétrolières (SEP), holds a 1.8 licence from RBQ (RBQ 5639-6898-01), authorizing us to carry out construction work on facilities intended to use, store or distribute a petroleum product, along with similar or related construction work. Our experienced team is qualified to rapidly undertake any project involving tanks for petroleum products.

Groupe SCP Environnement Inc. has carried out a number of site rehabilitation projects, including removing above-ground and underground tanks.

Petroleum and oil tank removal on contaminated site | Groupe SCP
Petroleum and oil tank removal testing on contaminated site | Groupe SCP

Environmental Monitoring

Environmental monitoring programs are sometimes required after certain site rehabilitation projects to ensure that the contamination problem has been totally dealt with. Normally these are programs to test samples of underground water for specific parameters for a few seasons.

Intervention in Case of a Spill

Groupe SCP Environnement Inc. has established a team of experienced technicians and professionals who excel in this type of work and we have on hand equipment to deal with spills, like absorbent pads, booms and pumps. This equipment is also for sale to clients.